Handling of excavated material, fill material, concrete and

Post New Homework

Question: I need a teams call to go through the house bill of quantites

(19) SUBSTRUCTURE

NOTE:

1. Rock is defined as any materials met within excavation which is of such size or position that it can only be removed by means of wedges, special plant or explosives.

2. Unless specifically noted, working space has not been measured separately as per ARM 4, the contractor shall allow within their rates for all working space as required. Need help with your online assessment? Schedule now!

3. The Contractor shall allow for all double handling of excavated material, fill material, concrete and all materials as necessary to complete the works in accordance with the Engineers drawings and specification.

4. The Contractor is deemed to have visited the site prior to tendering and fully acquainted himself with all conditions affecting the execution of the works including local conditions, access to the site and to the works and all other matters.