Download and examine the project task list from the link at the bottom of the page. Based on this task list, you will create a PERT chart and write a paper that discusses the following:
• Identify which set of tasks create the critical path.
• Determine which task would be best to crash to reduce the critical path.
• Determine if there is a change to the critical path by crashing the task. Is there a new critical path?
• What other information would be beneficial to know to see if the selected task was the best option for crashing?
Your paper should be 2-to-3-pages, well written and in conformity with the CSU-Global Guide to Writing and APA Requirements for style and writing expectations. Your PERT chart is part of your page requirements. Include a title page and a reference page that includes at least two outside references (not including your textbook) to support your analysis.