Question 1 Compare range of traditional and modern construction methods used in erection of framed buildings and justify the use of modern construction methods in relation to current practices.
Question 2 You are supposed to do a schedule of finishes in the above building and fill in the following table.
|
Floors
|
Walls internal
|
Walls external
|
Ceilings
|
Doors and windows
|
parking
|
|
|
|
|
|
Commercial (Shops)
development
|
|
|
|
|
|
Wet areas (Wash rooms, pantry, etc..)
|
|
|
|
|
|
Apartments
|
|
|
|
|
|
Outdoor areas (Terrence, balcony, etc..)
|
|
|
|
|
|
Justify your answer for each option considering the functional requirement of the space and physical properties of selected finish.
Question 3 Discuss about the design consideration for accessibility (disable persons) applicable for the project as per local statutory requirements.
Question 4 Assume that a building of the same scope to be designed in Pilimathalawa which is mostly effected by Landslide. Discuss the special consideration need to be incorporated in building design and construction in specific seismic areas.